Airport Taxi Way
The Problem The airport was suffering from the continual breakdown and chipping of the arris edges of the concrete slab on the taxiway where they are jointed. This was a…
Read more
The Problem The airport was suffering from the continual breakdown and chipping of the arris edges of the concrete slab on the taxiway where they are jointed. This was a…
Read more
The Problem A major power company required a recommendation for the right coating and surface preparation procedures to assure them a long-time performance of their secondary containment system (50% caustic…
Read more
The Problem This warehouse floor was reaching the end of its life cycle and the client was looking for a way to refurbish it instead of tearing it up and…
Read more
The Problem A power station was dealing with significant structural damage due to frequent sulfuric acid spillages from its pumps and tanks what they needed; concrete chemical damage repair. The…
Read more
The Problem A mid-west municipal power plant required a recommendation for the right coating and surface preparation procedures to assure a long-time performance for their bleach house secondary containment (12%…
Read more
The Problem A primary warehouse at a Michigan power plant faced significant flooring challenges due to years of heavy use they needed industrial floor restoration. The concrete floor, subjected to…
Read more
The Problem A nuclear power plant faced significant issues with its cooling tower basin the concrete was in need of repair. The basin was in a state of disrepair, with…
Read more