Power Plant Coal Mills Ceramic Tile
The Problem This Great Lakes power plant had a severe problem with ceramic tiles chipping and popping out. As you can see from the picture there was extensive damage so…
Read more
The Problem This Great Lakes power plant had a severe problem with ceramic tiles chipping and popping out. As you can see from the picture there was extensive damage so…
Read more
In August 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued a Final Rule regarding the safety of gas transmission pipelines. These new requirements amend 49 CFR 192 and…
Read more
The Problem A major beverage manufacturer was grappling with a significant issue in their power plant. The concrete floor had sustained considerable damage due to constant exposure to aggressive chemicals.…
Read more
The Problem A utility company faced a significant challenge with the deteriorating condition of their main warehouse floor, which was nearing the end of its lifecycle, it was in need…
Read more
The Problem A cold-water pump at a coal-fired power station had been earmarked for refurbishment after a routine maintenance inspection due to heavy “wear and tear” that it had been…
Read more
The Problem Abrasion Resistant Pipeline Coating: A gas company in Michigan faced a significant challenge with their pipeline, which stretched over four thousand feet through a field in Michigan. The…
Read more
The Problem Petrochemical Pipeline Refurbishment: A prominent midstream energy services provider faced a critical challenge with one of their petrochemical pipelines. The pipeline, suffering from severe corrosion, posed a significant…
Read more
The Problem Some valves at a compressor station needed a new coating, as an alternative to coal tar. The Substrate Metal The Solution The coal tar was grit blasted off…
Read more