High Build Floor Protection
The Problem USI was approached for a heavy-duty floor protection system suitable for the concrete floors operating in an aggressive industrial environment. The ideal system would offer longevity in service…
Read more
The Problem The floor of this candy factory in Indiana was being brutally attacked by citric and lactic acid. This caused the concrete to become cracked and pitted over time.…
Read more
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more
The Problem This hospital landing pad is a critical part of the hospital where emergencies are flown in. It was vital that it remained operational. The lights and cables around…
Read more
The Problem The client was having problems with a very wide movement joint (2.4 – 3.0 inches) between a building and the external concrete. This was causing difficulties for fork-lift…
Read more
The Problem This wastewater treatment plant wanted to improve plant safety to mitigate the risk of trip, slip and fall issues. The steps were original from 1956 opening of plant…
Read more
The Problem A chemical plant was seeing aggressive chemical attack on their floor. The customer had a cocktail of different chemicals that could be present at any given moment so…
Read more
The Problem The break room at this prominent steel company was in dire need of refurbishment. The decay happening to the floor was a safety hazard, and it was unsanitary.…
Read more
The Problem The client was having problems with a very wide movement joint (2.4 – 3.0 inches) between a building and the external concrete. This was causing difficulties for fork-lift…
Read more