Burm Buildup for Containment Area

Burm Buildup for Containment Area

The Problem

The EPA was about to fine this automotive engine manufacturer for the condition of their secondary containment. 

One of the issues was that if this tank leaked, the flow of this containment area was going to be in the wrong direction.

The Substrate

Concrete

The Solution

As you can see, we repaired many cracks, but also added burms to make the flow go in the proper direction. The product used here was Resichem 576 Quartz Screed.

After repairing the concrete and adding the burms, Unconventional Solutions sealed the area with Resichem 503 SPEP.

USI then coated the yellow striping with the USI Fast Cure Line Striping (yellow)

Products Used

Related Articles

Roof on WWTP Building

The Problem This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that it was causing

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a