The Problem

A city wastewater plant in Michigan needed to protect their pipe before the wall thickness became too thin and they were forced ton replace. This would have been extremely challenging and would have been $100,000’s+ to remove the old pipe and install a new pipe.

The Substrate

Metal

The Solution

 

Unconventional Solutions came in and trained the wastewater employees on how to make a fiberglass pipe around a pipe. The project only required roughly $ 20,000 in materials to repair and upgrade the piping for an additional 10+ years of service and potentially longer.

Surface preparation was completed with a solvent cleaner and wire brush to remove all existing loose rust and coating. Resimac 302 Epoxy Repair Cement was used as a surface tolerant. Then Resimac 703 Glass Tape was used with Resimac 301 Epoxy Resin which produced a high strength composite repair.

One year later the client was very happy with the results and has fixed additional pipes since.

Resimac 302 Epoxy Repair Cement

Resimac 703 Glass Tape

Resimac 301 Epoxy Resin

Related Articles

Roof on WWTP Building

The Problem This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that it was causing

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a