Power Plant Roof Repair

Power Plant Roof Repair

The Problem

The roof on this major power plant was neglected as the plant was scheduled for closure in three to five years. Tearing off and putting on a new roof was not financially feasible. The plant did not want to go another year without repairing all the leaks because of safety issues and possible freezing during the winter.

This customer had a good experience with other USI solutions, so they called us to avoid expensive replacement.

The Substrate

Bituminous

 

The Solution

Weeds and trees were removed and the roof was thoroughly cleaned, free of dust and debris. Next, we applied one grey coat of ResiChem 559 BP Primer for Bituminous Roofs. Then we applied two white coats of 550 WR Membrane. Since the repair, the plant has had several severe rainfalls with no leaks. 1/20/25 UPDATE: They did get 5 years out of roof until the tore the building down, and Andy Dobrzanski of DTE was pleased with the materials select and craftsmanship of the installation team. He even got promoted a few years later.

Products Used

559 BP Primer

550 WR Membrane

If you have a roof that is in need of a repair, reach out to the technical experts at USI today:

Related Articles

Roof on WWTP Building

The Problem This WWTP was seeing extensive corrosion with their infrastructure. The corrosion was so advanced that it was causing

Bridge Protection

The Problem Weathered Steel also known as ASTM A-588, ASTM A-242, or Cor-Ten works well in many environments, and gives

Gutter Protection

The Problem The roof of this building of a worldwide supplier of automotive and building control systems, has two 177ft.

Gutter Repair & Waterproofing

The Problem This gutter had been cut all the way through and was leaking very badly. The customer needed a