+248.735.7000
office@USIgroups.com

Category: Success Stories

Containment Area Repair

REINFORCING TAPE IN USE The Problem The EPA was about to fine this Truck Diesel Repair for the condition of their secondary containment. Unconventional Solutions was called in to save the day! The Substrate Concrete The Solution As you can see, we repaired the concrete lining, which includes the floors and walls. The product used…
Read more

Natural Gas Pipeline Repair

The Problem The corrosion on this Natural Gas Pipeline that fuels a Blast Furnace in an aluminum plant was in critical need of a corrosion resistant repair that would also build up a wall thickness. The pipeline had to be repaired in-place to make sure no unscheduled outages would occur, costing the plant time and…
Read more

Leaking Wastewater Pipe Repair

The Challenge On New Year’s Day, this drain commission found an active leak at a 3 inch “T” and had no replacement parts available. Fortunately, they ordered pipe repair material from Unconventional Solutions four months earlier. The Solution They used the RESIMETAL 108 Pipe Repair Tape and RESIMETAL 105 Aqua Stick and were able to…
Read more

Crusher Shaft Repair

The Challenge This shaft of a single toggle jaw crusher was exhaustively used in a mining facility.  The shaft weighed 3,000 pounds and originally cost over $20,000.  The journal areas had been excessively worn as a result of the aggressive working environment and many years of use. Four areas of heavy wear were identified for…
Read more

In Place HVAC Shaft Repair

The Challenge This Children’s Hospital had a large shaft that was damaged with extreme wear. They were looking at a high-cost project that would take weeks or months to execute. Large holes in the walls or roof would have been created (and then fixed!) to lift out the damaged part and bring in a long-lead…
Read more

Low Pressure Gas Leak Repair

The Problem After buying an existing distribution line, a local gas company in Ohio found out they had some small leaks. This was a low-pressure and low-consequence area, and they wanted an alternative to shutting down a major customer, while not sacrificing safety. Having met Unconventional Solutions at a Perdue Corrosion Short Course, they gave…
Read more

Spare Part – Valve Corrosion Protection

The Challenge This major natural gas company needed a solution to keep their larger critical spare parts corrosion free while in storage for an unknown future date of use. They need to keep larger, more expensive spare parts on hand, and ready to use, because when a part like that is needed for replacement, they…
Read more

Crude Oil Pit Rebuild & Protection

The Problem This old crude oil pit was severely decayed. Unconventional Solutions recommended removing the existing concrete and replacing it with 3M Scotchkote Screed RS 820. The customer, however, requested a more economical solution. The Substrate Concrete The Solution To accommodate the customer’s request, Unconventional Solutions suggested the use of fine sand and RESICHEM 502…
Read more

Power Plant Warehouse Floor Repair

The Challenge Years of heavy use, forklift traffic, water, cleaning chemicals and salts had severely damaged this floor at the primary warehouse of a Michigan Power Plant. The customer needed a long term solution that could be installed over the weekend, during a unit outage, to minimize inconvenience and downtime and save money by not…
Read more

Leeching Trench Repair

The Challenge This Refinery had a concern with soil contamination by ethanol solvents and hydrocarbons. They contacted Unconventional Solutions for a system that would repair, protect, and upgrade the trench to give them a long-term solution to protect the environment without costly tear-out and re-pour of the entire trench. The Solution The affected area was…
Read more