Scroll Case Refurbishment
The Problem Thousands of liters of water had been continuously pumped through the scroll, which was 120 feet long and had a diameter of 12 feet, to service the requirements…
Read more
The Problem This warehouse floor was reaching the end of its life cycle and the client was looking for a way to refurbish it instead of tearing it up and…
Read more
The Problem A power station was dealing with significant structural damage due to frequent sulfuric acid spillages from its pumps and tanks what they needed; concrete chemical damage repair. The…
Read more
The Problem A mid-west municipal power plant required a recommendation for the right coating and surface preparation procedures to assure a long-time performance for their bleach house secondary containment (12%…
Read more
The Problem A primary warehouse at a Michigan power plant faced significant flooring challenges due to years of heavy use they needed industrial floor restoration. The concrete floor, subjected to…
Read more
The Problem A nuclear power plant faced significant issues with its cooling tower basin the concrete was in need of repair. The basin was in a state of disrepair, with…
Read more
The Problem This Great Lakes power plant had a severe problem with ceramic tiles chipping and popping out. As you can see from the picture there was extensive damage so…
Read more
In August 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued a Final Rule regarding the safety of gas transmission pipelines. These new requirements amend 49 CFR 192 and…
Read more
The Problem A major beverage manufacturer was grappling with a significant issue in their power plant. The concrete floor had sustained considerable damage due to constant exposure to aggressive chemicals.…
Read more