Break Room Floor Refurbishment

The Problem The break room at this prominent steel company was in dire need of refurbishment. The decay happening to the floor was a safety hazard, and it was unsanitary.…
Read more

Innovative Conveyor Belt Repair at a Quarry

The Problem In the industrial sector, conveyor belts are essential for efficient operations. However, they are prone to tears and rips, which can cause significant production delays and financial losses.…
Read more

Butterfly Valve Refurbishment

Efficient Butterfly Valve Refurbishment at a Chemical Plant

The Problem At a chemical plant, a critical component – the butterfly valve responsible for controlling fluid flow – was underperforming. Years of abrasion and impact damage had taken their…
Read more

Compressed Air Pipe Corrosion Protection

Efficient Corrosion Protection for Compressed Air Pipe Over a River

The Problem Compressed Air Pipe Corrosion Protection: A company specializing in the supply of atmospheric and specialty gases to various industries, including aerospace, chemical, oil, and gas, faced a significant…
Read more

Conveyor Belt Cleat Repair

Rapid Conveyor Belt Cleat Repair at a Local Concrete Plant

The Problem A local concrete plant was facing recurring issues with their conveyor belts, particularly at the cleats. In an industry where downtime directly impacts productivity and profitability, these problems…
Read more

Concrete Repair and Overcoat

Concrete Repair and Overcoat

The Problem Due to hydrochloric acid in the environment, the concrete piers of this pickling line were severely corroded and had started to crumble the concreted needed to be repaired…
Read more

Burm Buildup for Containment Area

The Problem The EPA was about to fine this automotive engine manufacturer for the condition of their secondary containment.  One of the issues was that if this tank leaked, the…
Read more

Elevator Shaft at a Steel Mill

The Problem A steel mill in Michigan was experiencing heavy corrosion issues in the elevator shaft of one of their blast furnaces. The steel mill wanted the product to be…
Read more

Crumbling Concrete Wall

The Problem This concrete wall was cracking due to the fact of the Great Lakes freeze through cycle. It had been replaced several times before. The Substrate Concrete The Solution…
Read more

Leeching Trench Repair

Leeching Trench Repair

The Problem Leeching Trench Repair: This steel mill had a severely corroded secondary containment area caused by hydrochloric acid at elevated temperatures continuously hitting their trench.  USI was called in…