Wastewater Treatment Plant Containment Area Protection

The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more

Power Company Secondary Containment Repair

The Problem A major power company required a recommendation for the right coating and surface preparation procedures to assure them a long-time performance of their secondary containment system (50% caustic…
Read more

Concrete Chemical Damage Repair

Effective Chemical Damage Repair in Concrete at a Power Station

The Problem A power station was dealing with significant structural damage due to frequent sulfuric acid spillages from its pumps and tanks what they needed; concrete chemical damage repair. The…
Read more

Cooling Tower Basin Concrete Repair

Cooling Tower Basin Repair at Nuclear Power Plant

The Problem A nuclear power plant faced significant issues with its cooling tower basin the concrete was in need of repair. The basin was in a state of disrepair, with…
Read more

Concrete Floor Chemical Damage Repair

Revitalizing the Chemically Damaged Floor of a Beverage Manufacturer’s Power Plant

The Problem A major beverage manufacturer was grappling with a significant issue in their power plant. The concrete floor had sustained considerable damage due to constant exposure to aggressive chemicals.…
Read more

secondary-containment-wall-rebar-showing-and-pitting

Revitalizing Secondary Containment Concrete Repair for an Automotive Engine Manufacturer

The Problem An automotive engine manufacturer was facing imminent fines from the Environmental Protection Agency (EPA) due to the deteriorating condition of their secondary containment structure, it needed concrete repair.…
Read more

damaged truck island concrete

Truck Island Concrete Repair and Protection

The Problem The photographs show the badly damaged concrete surfaces of a truck island which is part of this refinery’s large truck unloading area. The project requirement was to completely…
Read more

Crude Oil Pit Rebuild and Protection

The Problem This old crude oil pit was severely decayed. Unconventional Solutions recommended removing the existing concrete and replacing it with RESICHEM 576 Quartz Screed. The customer, however, requested a…
Read more

Rescuing a Truck Diesel Repair Shop from EPA Fines with Effective Concrete Secondary Containment Repair

REINFORCING TAPE IN USE The Problem A truck diesel repair shop was on the brink of facing fines from the Environmental Protection Agency (EPA) due to the deteriorating condition of…
Read more

Acid Tank Relining

The Challenge USI’s reputation for Technical Support, Training & Trouble Shooting, had a fellow SEMPPES’s Member (South Eastern Michigan Power Plant Society) recommend USI to this Power Plant that needed…