High Build Floor Protection

The Problem USI was approached for a heavy-duty floor protection system suitable for the concrete floors operating in an aggressive industrial environment. The ideal system would offer longevity in service…
Read more

Citric Acid Protection

The Problem The floor of this candy factory in Indiana was being brutally attacked by citric and lactic acid.  This caused the concrete to become cracked and pitted over time.…
Read more

Wastewater Treatment Plant Containment Area Protection

The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more

Tank Chime Repair

The Problem A wastewater company was looking for a cost-effective and durable repair solution for their tank chimes. There was a 1½ in. gap that needed to be repaired and…
Read more

Corrosion Protection for a Steel Bridge

Corrosion Protection for a Steel Bridge at a Large Steel Mill

The Problem A bridge at a large steel mill was experiencing severe corrosion they needed corrosion protection for their steel bridge. The traditional method of grit blasting to prepare the…
Read more

Hospital Pad Repair

The Problem  This hospital landing pad is a critical part of the hospital where emergencies are flown in.  It was vital that it remained operational. The lights and cables around…
Read more

chiller refurbishment

Hospital Chiller Refurbishment

The Problem A university’s hospital was looking to spend $450,000 to purchase a new chiller. Instead of replacement USI provided them with a plan for chiller refurbishment. USI was able…
Read more

Concrete Stair Repair

Concrete Stair Repair Enhancing Safety at a Wastewater Treatment Plant

The Problem The wastewater treatment plant, operational since 1956, faced significant safety concerns due to the age and condition of its concrete steps and needed concrete stair repairs. These original…
Read more

Warehouse Concrete Floor Leveling

The Problem The client faced significant challenges due to an issue with concrete leveling at their facility. A substantial movement joint, measuring between 2.4 to 3.0 inches, had developed between…
Read more

Chemical Plant Concrete Flooring Repair

The Problem A chemical plant was seeing aggressive chemical attack on their floor. The customer had a cocktail of different chemicals that could be present at any given moment so…