Durable Floor Restoration at Steel Company’s Break Room
THE PROBLEM A steel company faced a significant challenge with the condition of the break room floor. The concrete floor of the 800 sq. ft. room had begun to crack…
Read more
THE PROBLEM A steel company faced a significant challenge with the condition of the break room floor. The concrete floor of the 800 sq. ft. room had begun to crack…
Read more
Pipe Color Code Standard and Piping Color Codes Chart
ABSTRACTThe use of horizontal directional drills (HDDs) is an ever-increasing pipeline installation technique. As HDDs increase, there is an increased probability for coating damage, even when coated with traditional mill or field applied…
Read more
PROBLEM Tank Farm Fuel Line Coating: A contractor responsible for maintaining a tank farm with airport jet fuel lines encountered significant challenges in their coating process. The jet fuel lines,…
Read more
The Problem The floor of this candy factory in Indiana was being brutally attacked by citric and lactic acid. This caused the concrete to become cracked and pitted over time.…
Read more
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more