Author: Delaney DeAngelis

Hospital Pad Repair

The Problem  This hospital landing pad is a critical part of the hospital where emergencies are flown in.  It was vital that it remained operational. The lights and cables around…
Read more

Shaft Repair in Mining Facility

The Problem This single toggle jaw crusher is located in a mining facility.  The bearings of the shaft weighing 3,000 pounds and costing over $20,000 new had been exposed as…
Read more

Tunnel Refurbishment

The Problem This tunnel carries cables to a large supermarket.  It was suffering problems with water ingress and high humidity. The high levels of humidity within the tunnel itself were…
Read more

Power Company Secondary Containment Repair

The Problem A major power company required a recommendation for the right coating and surface preparation procedures to assure them a long-time performance of their secondary containment system (50% caustic…
Read more