Chiller Plant at Big 10 University – 2015
The Problem A Chiller Plant needed repair at a Big 10 University after experiencing galvanic corrosion, also know as bimetal corrosion, which was eating away at the metals and causing…
Read more
The Problem This Michigan DOT bridge was starting to corrode because the previous coating system was failing prematurely. The customer wanted a solution that was minimal prep, easy to use,…
Read more
The Problem The airport was suffering from the continual breakdown and chipping of the arris edges of the concrete slab on the taxiway where they are jointed. This was a…
Read more
The Problem A major power company required a recommendation for the right coating and surface preparation procedures to assure them a long-time performance of their secondary containment system (50% caustic…
Read more
The Problem This warehouse floor was reaching the end of its life cycle and the client was looking for a way to refurbish it instead of tearing it up and…
Read more
The Problem A power station was dealing with significant structural damage due to frequent sulfuric acid spillages from its pumps and tanks what they needed; concrete chemical damage repair. The…
Read more
The Problem A mid-west municipal power plant required a recommendation for the right coating and surface preparation procedures to assure a long-time performance for their bleach house secondary containment (12%…
Read more