+248.735.7000
CS@USIgroups.com

Author: Tiffany Klingensmith

Concrete Chemical Damage Repair

Effective Chemical Damage Repair in Concrete at a Power Station

The Problem A power station was dealing with significant structural damage due to frequent sulfuric acid spillages from its pumps and tanks what they needed; concrete chemical damage repair. The…
Read more

secondary containment area in need of repair

Sodium Hypochlorite Secondary Containment Repair

The Problem A mid-west municipal power plant required a recommendation for the right coating and surface preparation procedures to assure a long-time performance for their bleach house secondary containment (12%…
Read more

Industrial Floor Restoration

Efficient Industrial Floor Restoration at Michigan Power Plant

The Problem A primary warehouse at a Michigan power plant faced significant flooring challenges due to years of heavy use they needed industrial floor restoration. The concrete floor, subjected to…
Read more

Cooling Tower Basin Concrete Repair

Cooling Tower Basin Repair at Nuclear Power Plant

The Problem A nuclear power plant faced significant issues with its cooling tower basin the concrete was in need of repair. The basin was in a state of disrepair, with…
Read more

Power Plant Coal Mills Ceramic Tile

The Problem This Great Lakes power plant had a severe problem with ceramic tiles chipping and popping out. As you can see from the picture there was extensive damage so…
Read more

Concrete Floor Chemical Damage Repair

Revitalizing the Chemically Damaged Floor of a Beverage Manufacturer’s Power Plant

The Problem A major beverage manufacturer was grappling with a significant issue in their power plant. The concrete floor had sustained considerable damage due to constant exposure to aggressive chemicals.…
Read more

warehouse floor in need of repair

Innovative Floor Refurbishment in a Utility Company Warehouse

The Problem A utility company faced a significant challenge with the deteriorating condition of their main warehouse floor, which was nearing the end of its lifecycle, it was in need…
Read more

Bronze Impeller Refurbishment

The Problem A power plant on a lake had a bronze impeller that suffered extensive corrosion and, in some spots, severe deterioration of the base metal. The company was looking…
Read more

pump in need of refurbishment

Pump Refurbishment

The Problem A cold-water pump at a coal-fired power station had been earmarked for refurbishment after a routine maintenance inspection due to heavy “wear and tear” that it had been…
Read more

Abrasion Resistant Pipeline Coating

Abrasion Resistant Pipeline Coating: Enhancing Pipeline Durability for a Michigan-Based Gas Company

The Problem Abrasion Resistant Pipeline Coating: A gas company in Michigan faced a significant challenge with their pipeline, which stretched over four thousand feet through a field in Michigan. The…
Read more