Paper Mill Pipe Repair
THE PROBLEM The Paper Mill Plant faced a critical issue with leaking, corroded, and eroded steel pipes. These pipes were impossible to replace without causing a major forced outage at…
Read more
The Problem An auto plant faced a recurring issue with its concrete striping pit and moisture control. The pit was experiencing damage due to condensation and moisture penetration caused by…
Read more
The Problem This floating roof was failing and leaking vapors into the air causing EPA issues. The customer had to decide between welding a new roof in or a make-do…
Read more
The Problem A leading University Hospital had been grappling with a persistent issue of galvanic corrosion in their chillers for over five years. The corrosion was causing significant problems, including…
Read more
Denso Application Training A North America Pipeline Company contacted USI to have one of their Denso Certified Application Trainers come to their location to learn about five Denso products and…
Read more
In 2021, OSHA is pushing harder than ever to reduce the number of injuries and fatal accidents contributed directly to welding and has labeled it a “high priority” in its…
Read more
The Challenge Friday afternoon – Repair Kit Coating Failure – USI Owner & President, Tiffany Klingensmith was getting ready for the weekend and got a call after 4pm. The customer said this…
Read more