Wastewater Treatment Plant Containment Area Protection
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more
The Problem A university’s hospital was looking to spend $450,000 to purchase a new chiller, in which installation would cost over $1 million. They couldn’t get the new chiller because…
Read more
The Problem The client faced significant challenges due to an issue with concrete leveling at their facility. A substantial movement joint, measuring between 2.4 to 3.0 inches, had developed between…
Read more
The Problem This wastewater treatment plant wanted to improve plant safety to mitigate the risk of trip, slip and fall issues. The steps were original from 1956 opening of plant…
Read more
The Problem A chemical plant was seeing aggressive chemical attack on their floor. The customer had a cocktail of different chemicals that could be present at any given moment so…
Read more
The Problem A major water plant was facing a critical issue with their 1,500-horsepower water pump they needed industrial water pump corrosion repair. The pump, essential for the plant’s operations,…
Read more
The Problem The twin lobe, of which there are two in each Blower, weighs 3½ tons. As can be seen, it had been subjected to heavy erosion and corrosion as…
Read more