Wastewater Treatment Plant Containment Area Protection

The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more

Steel Mill Bridge

The Problem This bridge at a large steel mill was severely corroded.  The company chose a USI solution that is water-based and requires minimal surface preparation.   Grit blasting costs can…
Read more

Hospital Chiller Refurbishment

The Problem A university’s hospital was looking to spend $450,000 to purchase a new chiller, in which installation would cost over $1 million. They couldn’t get the new chiller because…
Read more

Warehouse Concrete Floor leveling

The Problem The client faced significant challenges due to an issue with concrete leveling at their facility. A substantial movement joint, measuring between 2.4 to 3.0 inches, had developed between…
Read more

Concrete Stairs at a Wastewater Treatment Plant

The Problem This wastewater treatment plant wanted to improve plant safety to mitigate the risk of trip, slip and fall issues.  The steps were original from 1956 opening of plant…
Read more

Chemical Plant Concrete Flooring Repair

The Problem A chemical plant was seeing aggressive chemical attack on their floor. The customer had a cocktail of different chemicals that could be present at any given moment so…
Read more

Wastewater Treatment Plant Sewage Axial Flow Pump

The Problem The sewage axial flow pump at this wastewater treatment plant was damaged and no longer functioning at peak efficiency.  The company was looking for a cost-effective solution to…
Read more

Wastewater Treatment Plant Rotary Sewage Pump Housing

The Problem The rotary sewage pump housing at this wastewater treatment plant was starting to wear, and the company was looking for a way to protect it before serious damage…
Read more

Industrial Water Pump Corrosion Repair

Revitalizing a Major Water Plant’s 1,500-HP Water Pump

The Problem A major water plant was facing a critical issue with their 1,500-horsepower water pump they needed industrial water pump corrosion repair. The pump, essential for the plant’s operations,…
Read more

Twin Lobe Refurbishment

The Problem  The twin lobe, of which there are two in each Blower, weighs 3½ tons. As can be seen, it had been subjected to heavy erosion and corrosion as…
Read more