Vertical Inline Pump for Cooling Tower
PROBLEM The veins on this vertical inline pump for a cooling tower at a refinery had severe abrasion wear because of the 30 years of service it provided. The client…
Read more
The Problem The client was having problems with a very wide movement joint (2.4 – 3.0 inches) between a building and the external concrete. This was causing difficulties for fork-lift…
Read more
The Problem A chemical plant was seeing aggressive chemical attack on their floor. The customer had a cocktail of different chemicals that could be present at any given moment so…
Read more
The Problem One of the big three automotive plants had a condensate tank that was severely corroded. The replacement cost was going to be over $100,000. They called Unconventional Solutions…
Read more
The Problem This tank was leaking so the plant called USI to solve their issue. Since we have helped this paper mill in the past with emergency leaks, they wanted…
Read more
The Problem Tears and rips to conveyor belts are common problems in industry. Replacement of a conveyor belt is very expensive and time-consuming, which can lead to long delays in…
Read more
The Problem The butterfly valve at this chemical plant that is responsible for controlling the fluid flow was not working efficiently. The valve was in desperate need of refurbishment due…
Read more
The Problem A local concrete plant was continually having problems with their conveyor belts, especially at the cleats. Since they needed to be back in service very quickly, they opted…
Read more