Winterization Planning for Industrial Assets
Who It’s For
This session is useful for:
Plant Maintenance Manager
Reliability Engineer
Facilities Manager
Plant Operations Manager
Maintenance Technician
EHS ManagerAsset Integrity Engineer
Warehouse or Spare Parts Manager
Utilities or Piping Engineer
Capital Projects Manager
Today, we’ll discuss “Winterization Planning for Industrial Assets.”
So, you know, when winter hits, it hits industrial assets in many different ways, right? One of the biggest things that we see our clients work through is concrete breaking apart with cracking and spalling and just general concrete issues. We have some fast and durable epoxy concrete repairs here that help to bring those back to service very quickly. We also see that lines and tanks start to leak, right? Cold snaps stress the pipe, fittings, and tank seams. A leak in January needs a repair that’s fast, right? And mostly that’s because of that trip slip and fall issue. Water on the ground: When it’s hot out, it’s a nuisance. It’s going to go away on its own occasionally. Ice, however, is a much, much larger hazard. We’re going to go through some fast and easy-to-use pipe wraps that we have.
And then idle equipment, right? One thing that we don’t think about sometimes is when we bring in spare parts, you know, we put them in the parts room; that equipment can corrode over time. And then you have a shutdown, you need a part to go replace, and you pull it out, and it’s not in functional order. Winter does affect that as well because you have big temperature swings and humidity swings, and that can affect how quickly that stuff corrodes. And we’re going to go over some corrosion-protective films and emitters that can help protect that equipment.
So first is concrete repair, right? So here’s a couple of before and afters that we here at USI have helped people with. There’s a staircase, 66-year-old stairs that we helped rebuild and get back into a much better working order to avoid trip slip and fall risks.
Here’s another example: a cooling-tower basin with severely damaged concrete that was repaired and restored. We also provide flooring solutions. This chemical-plant floor was being damaged by chemical exposure, which was wearing away its coating. We helped restore and protect the surface. Grit can also be added to floors in areas exposed to moisture or other slip hazards to help reduce the risk of slips and falls.
For fast concrete repairs, we offer several options. Resimac 570 is designed for floor and ramp patches. It has a 20-minute working life, is ready for foot traffic in two hours, and can handle forklift traffic in four hours.
For vertical or overhead repairs—like parts of the staircase shown earlier—Resimac 571 is a lightweight concrete repair product. It’s touch-dry in eight hours and fully cured in three days.
For areas with heavy forklift traffic, Resimac 576 provides a more durable concrete repair. It’s ready for foot traffic in 24 hours and forklift traffic in 48 hours. That means a repair applied after closing on Friday can be ready for forklifts by Monday.
Winter also brings an increased risk of leaks. These examples show how we’ve helped customers repair leaking pipes without shutting down their operations. At a steel mill, we sealed a rapidly leaking water line in place. We also repaired a burst water and wastewater pipe while it was still running. At a paper mill, we reinforced a corroded steel pipe that was seeping, restoring it without an outage.
For these repairs, we typically recommend Resimac 103 and Resimac 108. The Resimac 103 metal repair compound is mixed and pressed into the leak, then held in place with the water-activated Resimac 108 wrap. The wrap helps secure the repair and rebuild strength in the pipe, for applications up to about 400 psi.
For a lower-pressure leak, another option is to apply the Resimac 103 metal repair stick and hold it in place with a rubber tourniquet.
Resimac 110 is a reusable rubber tourniquet that can hold Resimac 103 metal repair compound in place as an alternative to the 108 wrap. Once the repair has cured—typically after a couple of days—you can remove the tourniquet and reuse it on another pipe repair.
The repair process is straightforward. Whenever possible, reduce the pressure, isolate the line, or shut it down before beginning. If that isn’t possible, these products can be used to repair certain active leaks within their specified pressure limits.
Start by cleaning and abrading the area. Use a suitable solvent cleaner, such as USI Universal Cleaner, and a wire brush to remove surface contaminants. Then file or grind the area to create a rough surface for better adhesion.
Press the 103 metal repair compound into the leak. Secure it with either the 110 rubber tourniquet or the 108 water-activated wrap. To use the 108, soak it in water, then wrap it tightly over the repair. The required number of wraps depends on the pressure inside the pipe; use at least 10 wraps, and check with us for guidance on higher-pressure or specialized repairs.
Finally, smooth the repair and allow it to cure. As you apply the wrap, pressure may push some compound outward. Wipe your gloves clean, then smooth the compound back into place to help create a strong, even repair.
Resimac 102 is a fluid-grade version of our 101 metal repair paste. It can be used to resurface damaged flanges, seal leaking tank seams, and repair vertical surfaces.
Winter humidity changes can also contribute to corrosion in electrical boxes and rooms. Cortec’s VpCI products help protect enclosed spaces. The VpCI 101 emitter protects up to 1 cubic foot, the VpCI 105 protects up to 5 cubic feet, and the 111 protects up to 11 cubic feet. Choose the size that matches the space you need to protect. They provide protection for about 24 months, but we recommend replacing the emitters or pouches annually as part of a regular maintenance schedule. Record the replacement date in a maintenance log so it’s easy to track.
For larger enclosed spaces—up to 35 cubic feet—the Eco Pouch can be placed inside unused tanks, vessels, pipes, boilers, and heat exchangers to provide similar corrosion protection.
For larger parts that need to be stored, MilCorr® VpCI® film can protect components such as the flange shown here. The film contains the same VpCI technology as the emitter products. Wrap it around the part and heat-shrink it into place using an electric or propane heat gun. It’s UV-stable, so wrapped parts can be stored outdoors if needed. After more than three years of UV exposure, the film has shown no corrosion or degradation. When it’s time to put the part back into service, simply cut away the film—the part should be ready to use without the need to remove grease.
VpCI 126 offers similar protection for smaller parts, but without the same UV resistance as MilCorr®. It’s available in gusseted and resealable bags, as well as sheeting, covers, and liners. Depending on the film thickness and application, it can protect parts for up to five years. Keep the packaging sealed, and parts can be stored without coating them in grease or degreasing them before use.
What does your winterization plan look like? It’s already getting cold, so now is a good time to inspect your facility before temperatures drop further. Walk your floors and walls, check overhead areas, and look for concrete that needs attention. Do you have any active leaks that need a quick repair?
Even if you don’t have a leak right now, it’s a good idea to stock Resimac 108 and 103 before the deep freezes arrive. Choose the right tape size based on your pipes and the pressures you typically experience.
For stored equipment, check whether any spare parts are sitting in grease or otherwise need protection. You can reach us at office@USIGroups.com or 248-735-7000, or contact the person who invited you to this presentation. We can help you choose emitters to protect electrical panels and housings, or wrap idle equipment and spare parts so they’re protected through the winter and ready when you need them.
QUESTION:
“Where do you see the biggest opportunities for companies to move from reactive to preventive maintenance?”
ANSWER: I see three key opportunities. First, protect your spare parts. At one manufacturing facility where I worked, spare parts weren’t always given much thought. When someone needed a part, there was about a 50/50 chance it could go back into service, depending on how long it had been in storage. Even a small part can cause significant downtime, so it’s worth reviewing your storage areas and finding ways to better protect your equipment and assets.
Second, keep pipe-leak repair products on hand. Many facilities are dealing with aging infrastructure, and not having repair materials available when a leak occurs is a bit like not having a fire extinguisher when you need one. You want to be able to address leaks quickly—especially when they could disrupt production or create slip-and-fall hazards.
Third, inspect your concrete. Cracks and spalling that are present now can worsen during winter and become a bigger problem when everything thaws in the spring. Repairing damaged areas before winter can help prevent a more costly headache later.
If you have any more questions, we’ll be sending out a survey to everyone who attended to ensure we’re providing maximum value with these discussions. You can also reach out to us at 248-735-7000 or via email at office@usigroups.com.
Fast epoxy concrete repair Industrial concrete repair Industrial corrosion protection Industrial pipe leak repair Industrial winterization planning Live leak pipe repair Pipe wrap repair products Preventive maintenance for industrial facilities Spare parts corrosion prevention VCI emitters for electrical enclosures

