Wastewater Treatment Plant Containment Area Protection
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more
The Problem The original coating had failed following an incident when a valve had leaked and 3 quarts of 95% sulfuric acid had spilled onto the containment area lining. As…
Read more
The Problem A wastewater company was looking for a cost-effective and durable repair solution for their tank chimes. There was a 1½ in. gap that needed to be repaired and…
Read more
The Problem This wastewater treatment plant wanted to improve plant safety to mitigate the risk of trip, slip and fall issues. The steps were original from 1956 opening of plant…
Read more
The Problem A major water plant was concerned about the erosion and corrosion of their 1,500-horsepower water pump. Instead of replacing the water pump, they contacted USI for our repair…
Read more
The Problem This steel water tower had become damaged over a period of time and required refurbishing. The customer was looking for a high-performance long-term repair solution. The Substrate…
Read more
The Problem This wastewater treatment facility client called USI because they had a leak in a rubber lining of a steel tank that had been replaced two years ago. He…
Read more